Frequently Asked Questions
What makes excavation difficult in Amarillo soil?
Clay-heavy and variable soil conditions common in the Texas Panhandle require accurate grading and depth control to ensure long-term stability. At Lace Construction, we adapt excavation techniques specifically for Amarillo-area soil to prevent shifting and drainage issues.When should site preparation happen before building?
Site preparation should be completed before construction begins to correct grading, level the ground, and address soil issues. This step helps prevent drainage and structural problems down the line, ensuring a stable foundation for residential or commercial builds.How does proper drainage prevent property damage?
Installing drainage systems and culverts redirects runoff away from structures, preventing flooding, erosion, and foundation damage. In the Panhandle, where heavy rains can occur suddenly, long-term water management is critical for protecting both residential and commercial properties.What's the difference between site prep and excavation?
Site preparation focuses on grading, leveling, and soil correction to make land construction-ready, while excavation involves digging for foundations, utilities, or drainage systems. The two services are often paired together for comprehensive project readiness.Why do retaining walls help with erosion control?
Retaining walls hold back soil on uneven terrain, reducing erosion caused by rain and runoff. They're especially useful in Amarillo yards and commercial sites where elevation changes create water flow challenges and soil movement.Can you remove old concrete before installing a new driveway?
Yes, removing damaged or outdated concrete is typically the first step before driveway replacement. At Lace Construction, we handle removal and base prep together to ensure the new surface is properly graded and durable for local traffic and weather.What should I clear before starting land development?
Brush, debris, and unwanted vegetation should be cleared to improve land usability and construction access. Dense Panhandle terrain often requires heavy equipment, and clearing is commonly paired with grading and excavation for full site readiness.How does weather affect excavation timing in Texas?
Heavy rain can make clay soil unstable and harder to work, delaying excavation and grading accuracy. Scheduling during drier periods in the Panhandle helps ensure proper depth control and avoids equipment complications or project delays.What's the biggest mistake homeowners make with drainage?
Waiting until water damage occurs is the most common mistake. Installing drainage systems proactively, especially before site prep or landscaping, prevents costly repairs and protects foundations from long-term erosion and flooding.Do commercial projects require different equipment than residential?
Yes, commercial sites typically involve larger-scale excavation, access roads, and tighter timelines, requiring heavier equipment and experienced crews. At Lace Construction, we size our equipment and approach based on the project scope, whether residential or commercial.How long does a properly installed driveway last?
A well-graded and properly prepped driveway can last 20 to 30 years or longer, depending on traffic and weather exposure. Base preparation and drainage integration are key factors in durability, especially in climates with freeze-thaw cycles.Is snow removal needed often in Amarillo?
While snow events in Amarillo aren't constant, they do occur and can block access quickly. Arranging seasonal snow removal services in advance ensures reliable response during winter weather, reducing downtime and maintaining property safety.